MTA work event, 2022-10–01

by Dave Nordling, President, RRS.ORG


In the cooler temperatures of October, the society restarted our build efforts on the restroom container. It was great to have the support of several members including Dimitri Timohovich, Waldo Stakes and former president, Osvaldo Tarditti. We were able to make significant gains on the exterior plumbing connecting the water tanks and begin the heavier aspects of the interior plumbing for the toilets.

Setting up for a day of building at the MTA restroom
Thanks to Manny Marquez and his dad for helping with the effort.
Waldo and Osvaldo change out tools for the interior work.
Checking the spacing of things.
A lot more work is ahead of us.

We charged the water tanks with just a few hundred gallons in each to verify no leaks in the new header plumbing. We’ll bring more in later trips. We will need to meet at least a couple more times. Next build event is planned for November 6th. Our goal is to get an operational toilet, urinal and sink by year’s end. This much desired improvement remains our top priority.


Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.