MTA Firing Report, 2022-02-12

by Dave Nordling, President, Reaction Research Society


The University of Southern California (USC) Rocket Propulsion Laboratory (RPL) held a static fire test of their third solid motor design in the Earthshaker series. Prior designs resulted in failures and incremental corrections to the design were made for this test. Earthshakiiest was to be the largest impulse motor made by any collegiate team. Osvaldo Tarditti was the pyrotechnic operator in charge.

Earthshakiiest sits ready for static firing at the vertical test stand with sheet metal in place to protect nearby mounting surfaces.

Given the repeated recent failures of USC motor designs, the society required protective barriers installed in the event of another energetic failure. Unfortunately, this would prove to be a wise choice as failure did result right at startup. All personnel were at a safe distance or behind appropriate barriers.

Earthshakiiest motor ruptured at start and burned itself out.
Damage to USC’s test stand was total, The mounting points in the concrete were damaged such that further use is not possible..

The extreme heat from the explosion and fire destroyed the static fire stand, melted portions of the shielding and severely damaged the mounting points such that further use is not possible. USC is working with the RRS to clear and clean up the pad. Many of these tests are very dangerous and can damage our facilities. The society expects all groups to repair, restore or replace any of our assets damaged. A new method of holding future large solid motors is being discussed.

The society thanks our former president, Osvaldo Tarditti, for supporting this event as the pyrotechnic operator in charge and to Bill Inman for also supporting the event on behalf of the society. The operation was conducted safely and much was learned despite the poor outcome. USC will provide details from the testing soon and a path forward,


November 2021 Virtual Meeting


by Keith Yoerg (RRS Secretary)


The latest meeting of the Reaction Research Society took place Friday, November 11th and had 14 attendees. After a brief discussion on updates to this website (which are currently underway), we got the meeting started.

Screenshot of discussion during the monthly meeting

NOMINATIONS FOR 2022 RRS EXECUTIVE COUNCIL ELECTIONS

Official proceedings began with the nomination of Drew Cortopassi as the election chairman for this year. The following candidates were nominated to the ballot for the listed offices (write-in candidates are allowed).

President:    David Nordling (new)
Vice President:    Frank Miuccio (incumbent)
Secretary:    Keith Yoerg (incumbent)
Treasurer:    Larry Hoffing (incumbent)

Administrative and lifetime members should have received a ballot via email. If you believe you should have received a ballot but did not, please contact the RRS treasurer (treasurer@rrs.org). Ballots must be submitted by Thursday, December 9, 2021. Election results will be announced at the December monthly meeting on Friday the 10th.

BLOCKHOUSE ROOF REPAIR RECAP

With the election business handled, Osvaldo proceeded to extend a hardy thank-you to the RRS members who assisted in replacing the aging blockhouse roof earlier in the month: Dimitri, Bill, Jon, and Keith. A few photos and a time-lapse video of the process were shown, and an extra thank-you was extended to Dimitri for his efforts over several weekends to both finish the roof and haul the materials to and from the MTA. A more detailed write-up of the process from Dimitri is available on this blog here.

DISCUSSION OF UPCOMING MTA EVENTS

Several groups appeared ready to take advantage of the cooler desert weather during the upcoming month. Most of these events have already taken place at the time of the writing of this report, but were still in the planning stages during the meeting. Reports will be available on this site for each event if they are not already.

The planned events included: on November 20th, UCLA conducting a static firing of an ethanol-LOX liquid rocket in support of attempting to earn the FAR-Mars prize for an altitude of 30,000 ft; on November 28th, Keith Yoerg launching his 8″ diameter, 13′ tall rocket “The Hawk” on a 98mm solid rocket motor; and on December 4th, USC conducting further tests on their 8″ solid rocket motor. Wolfram Blume also expressed interest in attending to continue work on his rocket the “Gas Guzzler.”

YOUTH ROCKETRY CLASSES

Frank updated the membership on the youth rocketry classes. The launch date for the class in Boyle Heights was rescheduled to January 22nd because of concern the students and group may not have had the logistics prepared for the field trip.

Classes with the “Strive” group (which had been discussed in more detail during previous meetings & their write-ups) have been scheduled to run from February 2nd – March 2nd at 4pm on Wednesdays. The launch for this class will take place on March 5th, with March 12th reserved as a contingency day. The plan is to use lessons learned from the Boyle Heights class to help inform how this class will be run, which will also use Baby Berth Estes model rocket kits so that each student will be able to take a rocket home after the launch. Frank is also working with the LAPD “Community Safety Program” (CSP) to schedule a class with that group for the summer of 2022.

Osvaldo showing off the e-match igniters sized for use in model rocket motors

Talking about the classes kicked off a discussion of the support the society has prepared for the launch day during these classes. Osvaldo showed an example of the igniters which we plan to use – something far more reliable than the nichrome wire igniters included with Estes rocket kits. Larry and Dimitri shared what they had learned about the Cobra Wireless Firing System which we intend to use to launch the rockets. Dave Nordling also updated the attendees on the status of the PVC launch pad systems he has been working on.

MISCELLANEOUS DISCUSSION

More RRS members keep catching the bug and deciding to build model rockets! Chris Lujan showed of a model rocket kit that he built with his son and they plan to launch during the next youth launch up at the MTA.

Chris showing off the rocket he built with his son

Keith Yoerg then did an impromptu presentation on the build process that he used for his rocket “The Hawk” by showing a series of photos that he took along the way. This project has been in process since early 2021, and it is very exciting to see it nearly complete!

Photo showing the epoxy injection process for the internal fin fillets on “The Hawk”

Fred Radford then shared about his 8″ rocket – one very similar to “The Hawk” – including some very clever tools for sanding and the build process. This rocket is expected to use s C02 cartridge system for the parachute deployment. Fred is building this and other rockets out of a Maker Nexus makerspace in the Bay Area of California, where he operates his nonprofit “Space Makerspace” to teach kids how to build rockets.

Photo of several of the rockets built in Fred’s classes

NEXT MONTHLY MEETING

The next RRS monthly meeting will be held virtually on Friday, December 10th at 7:30 pm pacific time. Current members will receive an invite via e-mail the week of the meeting. Non-members (or members who have not received recent invites) can request an invitation by sending an email to:

secretary@rrs.org

Please check your spam folders and add secretary@rrs.org to your email whitelist to make sure you receive the invitation.

October 2021 Virtual Meeting

by Dave Nordling, RRS.ORG


The Reaction Research Society held it’s monthly meeting by teleconference on Friday, October 8, 2021. Some of our members were on travel, but the those in attendance were able to discuss several important issues.

The USC RPL static fire event on 9-26-2021 was safely conducted but ended in a explosion and fire which was ably contained. This was a good example of careful preparations and good management of the people present for the event. A firing report has been posted for this event. Osvaldo Tarditti was the pyrotechnic operator in charge that day.

UCLA had requested the use of the MTA on 10/16/2021 for their next liquid rocket engine test. The MTA was already reserved for Bill Claybaugh’s solid rocket flight that same day and in the days leading up to the event. Dave Nordling was the pyro-op in charge, A firing report for this event will be posted,

UCLA is planning to hold their conceptual design review (CoDR) on 10/22/21 for the next iteration of their liquid rocket. RRS members Dave Nordling and John Krell plan to attend.

Wolfram Blume was on the call and said he was eager to return to the MTA for a second flight attempt of the Gas Guzzler ramjet. With the summer heat gone, he hopes to return at our next launch event which is still being planned. It is hoped that the society can continue their streak of having at least one MTA event per month as we have done since the start of 2021.

The restroom container was purchased and brought to the Compton Airport for interior construction. This 20-foot high cube has a 9.5 foot ceiling and should be able to have two individual rooms with toilet and sink, one of these to have a shower stall. Osvaldo had drafted a floor plan and this was approved by the council. The society will be meeting at the Compton Airport on Saturday, October 23rd, for a late morning barbecue and an in-person discussion of the materials needed to get the restroom interior built. All members are welcome but please notify Keith, Wilbur, Xavier or Dave Nordling if you’re coming as they have access to the airport.

RRS containerized restroom awaits interior design and build

There was some discussion about the septic system and leach field. It is important to maintain an appropriate distance from any nearby water wells, one of which is on Polaris Propulsion property. Sufficient clearance exists based on measurements made and EPA guidelines. The leach field will be positioned to drain away to the north.

The society is considering buying a concrete septic tank but RRS member Wilbur Owens may have a plastic septic tank already available for the society. Some members feel a concrete septic tank will last longer and be less likely to leak. The council is still debating this feature and should render a decision soon.

The society also discussed the water supply to the restroom container and the supporting structure needed to hold a tank on top of the container. There are many important facets to this infrastructure addition which must be weighed carefully.

Nominations for RRS executive council offices will be held at next month’s meeting, November 12th, 2nd Friday of the month at 7:30pm. An election chairman will be selected beforehand and this person must be an active member not holding office nor running for office. A special email address will be set up for the election chairman to gather votes from our active administrative and lifetime members. Results to be announced at the December 10th meeting and new terms to start January 1, 2022.

For any questions, please contact the RRS secretary.