The Reaction Research Society held it’s monthly meeting by teleconference on Friday, October 8, 2021. Some of our members were on travel, but the those in attendance were able to discuss several important issues.
The USC RPL static fire event on 9-26-2021 was safely conducted but ended in a explosion and fire which was ably contained. This was a good example of careful preparations and good management of the people present for the event. A firing report has been posted for this event. Osvaldo Tarditti was the pyrotechnic operator in charge that day.
UCLA had requested the use of the MTA on 10/16/2021 for their next liquid rocket engine test. The MTA was already reserved for Bill Claybaugh’s solid rocket flight that same day and in the days leading up to the event. Dave Nordling was the pyro-op in charge, A firing report for this event will be posted,
UCLA is planning to hold their conceptual design review (CoDR) on 10/22/21 for the next iteration of their liquid rocket. RRS members Dave Nordling and John Krell plan to attend.
Wolfram Blume was on the call and said he was eager to return to the MTA for a second flight attempt of the Gas Guzzler ramjet. With the summer heat gone, he hopes to return at our next launch event which is still being planned. It is hoped that the society can continue their streak of having at least one MTA event per month as we have done since the start of 2021.
The restroom container was purchased and brought to the Compton Airport for interior construction. This 20-foot high cube has a 9.5 foot ceiling and should be able to have two individual rooms with toilet and sink, one of these to have a shower stall. Osvaldo had drafted a floor plan and this was approved by the council. The society will be meeting at the Compton Airport on Saturday, October 23rd, for a late morning barbecue and an in-person discussion of the materials needed to get the restroom interior built. All members are welcome but please notify Keith, Wilbur, Xavier or Dave Nordling if you’re coming as they have access to the airport.
There was some discussion about the septic system and leach field. It is important to maintain an appropriate distance from any nearby water wells, one of which is on Polaris Propulsion property. Sufficient clearance exists based on measurements made and EPA guidelines. The leach field will be positioned to drain away to the north.
The society is considering buying a concrete septic tank but RRS member Wilbur Owens may have a plastic septic tank already available for the society. Some members feel a concrete septic tank will last longer and be less likely to leak. The council is still debating this feature and should render a decision soon.
The society also discussed the water supply to the restroom container and the supporting structure needed to hold a tank on top of the container. There are many important facets to this infrastructure addition which must be weighed carefully.
Nominations for RRS executive council offices will be held at next month’s meeting, November 12th, 2nd Friday of the month at 7:30pm. An election chairman will be selected beforehand and this person must be an active member not holding office nor running for office. A special email address will be set up for the election chairman to gather votes from our active administrative and lifetime members. Results to be announced at the December 10th meeting and new terms to start January 1, 2022.
For any questions, please contact the RRS secretary.
The latest meeting of the Reaction Research Society took place this past Friday, May 14th and had 20 attendees – including a guest presenter and a project update from the Compton Comet team, which is composed of RRS members. We kicked off the meeting saying vitrual hello’s and catching up on personal updates.
UPCOMING EVENTS AT THE MTA
The group kicked off society business by planning for upcoming MTA events later this month. Wolfram Blume is continuing progress on the Gas Guzzler, but windy forecasts continue to limit his ability to do further launch testing. Osvaldo and Wolfram planned to visit the MTA on May 16th to do a practice setup for a future static firing and some housekeeping tasks at the property.
Osvaldo also informed the membership about an active day planned for Saturday, May 29th with groups from UCLA planning to do another static firing of their hybrid motor and a liquid rocket launch to 33,000 ft. and a team of students firing model rockets. Several additional RRS members expressed interest in attending this event.
GUEST PRESENTATION – COBRA FIRING SYSTEMS
Scott Smith, the founder of Cobra Firing Systems was our guest presenter for this month, continuing our recent discussions on wireless launch controllers. Scott has been in the pyrotechnics industry for 10 years, and developed Cobra into a 25-person company with roughly 14,000 customers around the word. They have worked with Mythbusters, Disney, and the US Military to name a few.
RRS member questions for Scott focused on safety, in particular the risk of misfires and adding a physical shunt to the system. The data is encrypted, includes checksums, and is built around a US-based company Synapse, which has allowed the company to avoid any reports of accidental misfiring due to stray wireless signals. Cobra firing boxes are modular in nature and allow for what the company calls a “slat” – which allows for a cap to be used as a physical, mechanical shunt on the system.
MEMBER PRESENTATION – COMPTON COMET
RRS student members Manuel Marques, Aarington Mitchell, and Tre Willingham presented on the status of their project the “Compton Comet” which is being built at the Compton Airport under the guidance of RRS members Waldo Stakes and Dave Nordling.
The rocket is a 75% ethanol & liquid oxygen bi-propellant rocket with a regeneratively-cooled engine. The engine is a surplus XLR-11 which should produce roughly 1,500-lbf of thrust, and was originally used in a group of 4 to power the Bell-X1 (the first aircraft to break the sound barrier). The rocket is estimated to reach an altitude of 20,000 km and will use a 2-parachute dual deployment recovery system.
THE FUTURE OF IN-PERSON RRS EVENTS
Members discussed the likelihood of in-person RRS events like the Symposium and meetings at the Gardena Community Center in 2021. It mentioned that the Symposium typically takes between 90 to 120 days to prepare, and it would be unlikely that the RRS would host one before spring 2022. There was a bit more of an optimistic outlook on the monthly meetings with a tentative goal set for a return to the Community Center in August (pending COVID restrictions).
MTA PERMANENT BATHROOM STATUS UPDATE
Designs and plans for the permanent bathroom structure at the MTA have been the main focus of the ongoing, twice-monthly meetings of the RRS Executive Council. Frank updated the membership on the current status of the project, which has gone through several iterations. Currently, RRS member Wilbur is working with professional drafters to get precise designs on paper – including model numbers for things like toilets and water heaters. A precise, written design will help the society get a final product that matches expectations.
The current plan is to build 2 or 3, 20-foot containers with 2 bathrooms each or 1 bathroom and 1 shower. These will be transported to the MTA and installed on concrete plinths which drain to a concrete septic tank and leach field. Water will be supplied by a well and stored in a tank installed on top of the bathroom or a nearby storage container. The bathroom facility is planned to be located southeast of the Dosa building, alongside the existing storage containers.
RRS BY LAWS
The RRS Executive Council has reviewed the recommended changes to the By Laws provided by the 2020 constitutional committee. Following are the By Laws as agreed to by the 2021 RRS Executive Council:
LAUNCHING & STRUCTURES
Richard Dierking raised a question regarding the new structure being built on the Polaris land adjacent to the RRS site, and whether it must be considered an occupied structure during launch testing at the RRS site. This prompted a lively debate about the nuances of the regulatory framework around rocket activities in the Mojave desert, with several members voicing their opinions.
Safety of all personnel must be the #1 priority during activities at the MTA & communication between between the RRS, FAR, and Polaris is the best way to ensure that. Concurrent operations at adjacent properties are avoided when possible, and the RRS maintains relationships with our neighbors so that the Pyrotechnic Operator in charge is in contact with & can ensure the safety of personnel at adjacent property when operations overlap.
NEXT MONTHLY MEETING
The next RRS monthly meeting will be held virtually on Friday, June 11th at 7:30 pm pacific time. Current members will receive an invite via e-mail the week of the meeting. Non-members (or members who have not received recent invites) can request an invitation by sending an email to:
The RRS held a launch event at our Mojave Test Area (MTA) on April 10, 2021, the day after our monthly meeting. COVID-19 still remains a threat so everyone continued to observe protective protocols – masks & physical distancing. For the first time in months, we had a day with great weather for launching rockets and we made the most of it! We had low-power, high-power, and experimental solid rocket launches, another launch of Bill Inman’s Solar Cat, the maiden voyage of Wolfram Blume’s Gas Guzzler, and a static fire of Larry Hoffing’s solid power motors. Osvaldo Tarditti was our pyrotechnic operator in charge.
CTRL+V (USC RPL)
Preparation for the first launch of the day: CTRL+V actually began the day before launch with motor integration and other preparation work taking place at the MTA site. On the morning of the launch, the team from the USCRPL installed the rocket on the launch rail, which was then raised into place south of the MTA’s vertical test stand. Wires running from the rail were staked to poles and hammered into the ground to provide additional stability for the rail. Several launch crew members can be seen prepping the rocket above, and a still image of the launch of the rocket can be seen below.
The rocket flew on a 6″ experimental rocket motor. A specific procedure was followed prior to launch, under the supervision of the pyro op, which included radio go/no-go call outs from several teams including tracking, avionics, and even a drone that took footage of the launch! All spectators and crew were in the bunker during takeoff at 11:04 am – ignition was prompt and rocket left the rail quickly and cleanly. The initial telemetry reported by the team indicated an altitude of over 11 km. Several members then went off on the daunting task of recovering the rocket from wherever it landed.
LUMINEER (BPS.space)
The next flight of the day came from BPS.space with the rocket Lumineer. This launch was conducted from one of the pads just west of the vertical test stand. The flight took place around 1:20 pm on a commercial Cessaroni “N” motor and was livestreamed to a reported 9,000 viewers on YouTube. The rocket utilized a “fly-away” rail guide to provide stability and eliminate the drag of rail buttons, which can be seen still in the process of falling from the rocket in the image below. The target altitude was 10 km, but telemetry was lost shortly after takeoff so the actual peak altitude was unclear after launch, and the rocket was not recovered for some time.
GAS GUZZLER (Wolfram Blume)
Wolfram Blume has been diligently making the pilgrimage to the MTA events over the last several months and the weather has been uncooperative for his chances of launching, but that finally changed in April! The maiden voyage of the GasGuzzler took place from the pad just west of the vertical test stand. This flight was conducted to answer several questions about staging during the flight – so the ram jet second stage was flown empty and only the first stage, commercial solid rocket motor was used to power the rocket. A slow-motion (10% full speed) video of the launch can be seen here.
The ascent of the rocket was smooth, validating the rigidity of the rocket’s design and the stability when empty. The data from onboard altimeters confirmed that the ram air entering the 2nd stage was enough to separate the 2 stages immediately (0.1 second) after motor burnout which occurred at 1,440 ft. The parachute for the booster stage deployed successfully and that stage was recovered without damage. The ram jet, upper stage utilizes a dual-deployment of a drogue parachute at apogee and main parachute at 1,000 ft above the ground. While each of these deployments were successful, the main parachute did not pull out of the deployment bag so the stage landed hard and damaged a few parts. Fortunately, the 2nd stage is not the final parts intended for the full flight of both stages so there will not be delays to the project to rebuild. Wolfram collected lots of useful data and plans to add a GPS tracker and other upgrades before his next flight. We all hope the weather remains in his (and all of our) favor!
CHARLIE HORSE (Keith Yoerg)
Up next was the 12th flight of Keith Yoerg’s rocket Charlie Horse. This was the first flight test of the LoRa GPS tracking boards discussed in previous reports. There are several difficulties with getting the units setup properly, not least of which being the frequent firmware updates required to pair the board with the mobile phone app (2 updates in as many months). Powering up the boards the night before would have helped eliminate these struggles, but a successful launch was still completed, a slow-motion (10% full-speed) video of the launch can be seen here, which was on a commercial Cessaroni I280-Smokey Sam motor.
One issue still to be resolved with the LoRa trackers is a setting within the Meshtastic mobile application which trades off tracking range for the speed at which new information packets are sent. The “medium” setting was used on this flight but for rocket flights it may be advantageous to reduce the range (which is purported to be up to 10 miles) in favor of more frequent location updates. More testing will be done on future flights in hopes of developing a cheap, simple GPS tracking available for rockets flying at the RRS.
SOLAR CAT (Bill Inman)
Bill Inman’s solar-heated steam-powered Solar Cat rocket took to the skies around 4:31 pm. While the weather was perfect for most of the projects, the light overcast that can be seen in the pictures above proved problematic for the solar heating required for the best flight. In addition by launch time, the solar collector was at its westernmost limit so no more heating was possible. At launch the water temp was 370 F and was at 130 psi.
The flight reached 41 mph speed and achieved a 60 ft altitude. While this was an improvement on the first Solar Cat launch at the MTA, with additional heating there could be even more impressive stats. While he can’t control the clouds, Bill hopes to arrive at the MTA site the night before a launch in the future to increase the chances of getting off a good test and launch before reaching our western limit of travel for the solar collector.
THE YOERG CHALLENGE (Dimitri Timohovich & Keith Yoerg)
With this being Dimitri’s last MTA event before leaving to Alaska for the summer, some other RRS members need to step up to the plate to keep the “Yoerg Challenge” alive. I have put out the call for more RRS members to build low-power rockets to fly at the MTA, and have left my 5-pad PVC launcher at the site for future launches. IT’S CHEAP, IT’S FUN, IT’S A CHALLENGE (and everyone is a winner)! What’s not to love? So get out there and build some model rockets!
The entrants this month included Keith’s Big Bertha, Baby Bertha, and Hi-Flyer XL rockets and Dimitri’s Space Crater – which carried eggs in honor of Easter this month. Fortunately, Dimitri’s wife had the foresight to hard-boil the eggs because his rocket took the “Crater” part of its name a bit too seriously (the remains are shown above). A few of Keith’s flights before the GoPro battery died can be seen here.
SOLID MOTOR TEST FIRE (Larry Hoffing)
Larry Hoffing had some experimental solid rocket motors ready to test fire, but with all the other activity going on at the site he took the time to install a new “No Smoking” sign on the covered propellant loading area (shown below). Once things were a little less active, Larry was able to affix the motors and perform a test-fire. While the burns were long, they did not produce much thrust and need to be improved upon before use in a rocket.
CONCLUSION
In addition to everything detailed above, one of the USC RPL members flew a high power rocket to earn her Level 1 certification with the National Association of Rocketry, and Dimitri flew his water rockets with his son.
This was by far the most active event at the MTA in the past year and was an exciting day for anyone who likes to see rockets fly! Our next launch date has not been decided upon, but we hope to have an event in May to continue hosting at least one event per month at the site.