MTA work event, 2020-10-03

by Dave Nordling, Reaction Research Society


The long awaited work event at the Reaction Resesrch Society’s private testing site, the Mojave Test Area (MTA) took place as planned on Saturday, October 3rd. We had a good turn-out to take on a few of the much needed repairs, cleaning and maintenance activities around the site. These work events not only improve the site but also enhance it’s appearance for our visiting guests. The RRS takes pride in our one-of-a-kind site and working on our site makes us all more closely connected as public activities are so few during these unprecedented times. All activities were able to maintain social distancing and everyone had their mask.

The primary purpose of this event was maintence activities but secondarily we were ready to conduct launches if members had projects ready. I was the pyro-op in charge for that day if there was to be any launches. Wolfram had cancelled his first flight attempt of the Gas Guzzler two-stage rocket due to concerns with excessive heat. Also, my next attempt to fly my nitrous-oxide hybrid rocket was postponed as we needed more people to work the planned maintenance events throughout that day. Bill Inman had contacted me with his proposed solar heater experiment. After a cursory review of his experiment, the society allowed him to proceed. Bill makes a very long journey to the MTA from Carson City, Nevada, and we are glad he has chosen the MTA to conduct his initial experiments for his next generation steam rocket.

Osvaldo led the repair and refurbishment efforts that day. Despite the higher peak temperatures that day, a lot of work was done which has helpful in restoring the site.

The arched sign welcomes our membership and guests to the RRS MTA. Still looking great after years in the desert.

REPAIR OF THE 8-INCH ADJUSTABLE BOX RAIL LAUNCHER

The 8-inch adjustable box-rail launcher was damaged in a failed solid motor launch last year at the MTA. The resulting explosion destroyed the four adjustable rail guides and distorted a few of the box frame members. Given the heavy and large size of this box rail launcher, it was only practical to conduct repairs at the site and bring in new steel materials to be cut, grinded and fitted for welding such that all parts fit correctly.

Getting ready to build new rails in the 8-inch adjustable rail launcher

The replacement rail guides used thick square stock instead of the previously used round stock. This was done for both having a flatter surface for clamping and holding the rails in place but it also made moving the rails easier to do than with the closer fitting round rails. The square slider pieces were also more easily welded to the square rails with much grinding.

Osvaldo and Dmitri did excellent work. With the right tools, material and skill, the job was done by mid-afternoon. The four rails are back in place, but some of the box rail members remain bent or distorted. Although not entirely perfect, the rail launcher should now be useful again for future tests,

John Krell (left) and Dmitri Timohovich (right) inspect the repairs on the 8-inch box rail launcher at the RRS MTA on 10/3/2020

TUMBLEWEED AND BRUSH REMOVAL

A lot of the team was working on clearing the immediate area of tumbleweeds near the many structures and sites around the MTA. Alastair Martin and Keith Yoerg worked many hours with a metal rake and shovel and made a marked difference around several overgrown spots. Tumbleweeds are a persistent nuisance throughout the western United States and Mexico as they thrive in the dry hot climate. Removing them is fairly easy, but disposing of them is far more challenging. Fire hazards are one of the topmost concerns in amateur rocketry. Our desert launch site is always under this threat. By periodic clearing and disposal, the threat of fire propagation can be minimized.

Clearing the east side of the container fenced area.
The large vertical test stand after some clearing efforts both on the ground and on the upper decks.
Second view of the large vertical test stand at the RRS MTA at the end of our 10/3/2020 work event.
Waldo drags an old iron launch platform to clear the vegetation from around the MTA site

Keith and Alastair did a lot of hard work in manually clearing the edges and the upper decks of the vertical test stand. Waldo Stakes was also kind enough to drag the area to clear wider spaces more quickly, The result is a clearer work area better able to conduct rocketry activities at the MTA.

CORROSION PREVENTION AND PAINTING

Frank Miuccio and Chris Lujan worked on the metal lattice covers on the two front windows of the Dosa Building. They sanded and brushed on rust remover to clear the surfaces for a protective paint coating, It was a lot of fine detailed work but the resulting look of the metal grates without rust looks so much better.

Frank carefully sands, treats and paints the metal lattice covering on the front windows of the George Dosa building at the 10/3/2020 MTA work event.
Chris Lujan steps back from his work on the other front window of the George Dosa building.

Little touch-ups can be very time-consuming but it is worth taking the time to do the job well. There are many areas around the MTA that could benefit from some corrosion removal and surface protection. Although the desert is dry, the caustic, salty, dry lake environment can erode steel surfaces over the years.

SOLAR CONCENTRATOR EXPERIMENT

RRS corresponding member, Bill Inman came out to the RRS MTA work event to conduct a test of his first prototype solar concentrator for heating his next generation steam rocket. The experiment was a simple apparatus design to focus sunlight on a length of 2-inch black-painted iron pipe holding roughly 2,7 liters of water.

The wooden box had two angled mirrors to focus most of the incident sunlight near the pipe. To avoid natural convection losses, his concentrator had a clear glass panel enclosure. In essence it is a trough heater. The goal was simply to understand the practical operation of this first device and make improvements to see if a solar-based heating scheme for a steam rocket is feasible. Bill’s device had approximate pressure relief should the concentrator over-perform.

Bill Inman’s first prototype solar trough collector for heating a steam rocket tested on 10/3/2020

Results were a little lower than expected, but a measurable gain in water temperature was measured after operating throughout that afternoon, Air temperatures reached a peak of 104 degrees Fahrenheit (F) and the peak water temperature was 180F, far short of boiling temperature (212F) at amibent pressure. Effective steam rocket temperatures are often around 350F to 400F. There is more work to be done.

A FEW SMALL ROCKETS LAUNCHED

Keith Yoerg prepares the Big Bertha for launch on his wire rail launcher.

Keith Yoerg had brought a few small rocket kits for launching at the MTA during a break in the maintenance work. A classic Big Bertha and Baby Bertha each with B6-4 motors. The winds were very light and good for launching these small rockets. Both were ably recovered.

IDEAS FOR FUTURE WORK AT THE MTA

Near the end of the day, we discussed new improvement tasks at the MTA. A few of these were listed below:

  • Further removal and disposal of tumbleweeds, there are a lot along the eastern fence and in the flame bucket of the large vertical thrust stand. Burning them under controlled conditions is one possibility but winds must be very low
  • More ideas for the new restroom facility were discussed that could take advantage of pre-existing materials or assets at the MTA
  • Removal and replacement of the bent steel panel on the vertical thrust stand. New steel panels were made with the matching hole pattern.
  • Rust removal, corrosion prevention and painting of the large vertical test stand structure is a lengthy project but would greatly improve the look of the whole site.
  • Removal and replacement of the old blockhouse roof and shoring up the existing walls is being considered as a lower cost upgrade to this important and often used asset at the MTA.
Taking some measurements around the bent panel on the vertical test stand at the RRS MTA

It was a great team effort that day and everyone worked very hard. Nearly all of the planned objectives were accomplished. It has been suggested that another work event at the MTA be planned for next month. We also hope to work in a few launches if we can.

These ideas and other topics will be discussed at the next meeting of the RRS on Friday, October 9th. We’ll hold this meeting by teleconference again due to COVID-19 restrictions. Those wishing to attend should contact the RRS secretary.

secretary@rrs.org


September 2020 virtual meeting

by the Reaction Research Society


The Reaction Research Society met on September 11, 2020, by teleconference. Several members called in from out of state. After calling the meeting to order and the reading of the treasurer’s report, we began to discuss events to come and those in planning.

Attendees of the Seotember 2020 meeting by teleconference

MTA WORK EVENT 10/3/2020

The next event at the Mojave Test Area will be on Saturday, October 3rd. This will be a work event to repair our large adjustable rail launcher, remove tumbleweeds and brush from around our site, fix the two cut strands of barbed wire at our front gate, clean off corrosion from several areas and also potentially replace the bent panel on the vertical thrust stand. Osvaldo is leading the work event and all members are encouraged to come out. In addition to bringing sunscreeen, proper desert attire and footwear, bringing work gloves will be very useful.

John Krell wearing his facemask standing before our front gate with two of the barbed wire strands cut. This is one of many things to be repaired at the MTA.
Bent panel on the vertical test stand
The 8-inch adjustable rail launcher is still under repair from the failed July 2019 launch. The inner adjustable rail slides are being built from scratch. One of the outer braces was blown off and some of the angle frame pieces are distorted. This will require a lot of rework but we hope to have this launcher back in service soon.

As with all events at the MTA, social distancing and facemasks are required by all attendees at this event. Newcomers must request permission to attend and sign our indemnification waiver in advance of their arrival. See our website for these forms and submit them to the RRS president.

At this same event, we may also have a few launches if members are ready to do so. Dave Nordling was appointed to be the pyro-op in charge for this day. Wolfram Blume had planned to attempt his first flight of the two-stage Gas Guzzler to verify the staging and recovery systems. The nitrous-oxide hybrid motor is also ready for another launch attempt at this event.

Bill Inman also plans to join us at the MTA to conduct some tests of his solar concentrator to be used with his next generation steam rocket still in build.

NEW RESTROOM FACILITY AT THE MTA

Last year, the executive council set priorities for improvements at the Mojave Test Area. At the top of the list was building a new restroom facility which would offer our guests greater comfort than the current facility.

Larry Hoffing and Dave Nordling have begun to approach potential contractors willing and able to build a modest facility at our site. No formal proposals have yet been received yet but the society expects to have more to share in the coming month. With the hot summer months receding and the cooler temperatures of autumn approaching it is a perfect time to begin this project.

Given our modest budget, we are asking for donations to help the society make this much asked for and much needed improvement. Donations to the RRS are tax deductible as we are a registered 501(c)3 educational non-profit group in California. Our Paypal link is one our website and if there are any questions please contact the RRS president or any member of the executive council.

2021 RRS SYMPOSIUM

It was recommended that we try to set a firm date for the 2021 RRS Symposium with the Ken Nakaoka Community Center on a Saturday in late March. Although it is not certain if the symposium can be held, preparation for the symposium can take many months. Frank was going to see if a tenative date could be established only for planning purposes. If COVID-19 restrictions in Los Angeles were lifted to allow our symposium, we would have little time for advanced planning. There’s liitle to lose in scheduling the event and postponing if it becomes necessary.

IN CLOSING

Contact the RRS secretary with questions. Next meeting will be held virtually on October 9, 2020, 7:30pm. Contact the RRS secretary for details.